Steam electrode boiler ACME, high voltage
26.03 - 19.05
Производител: ACME
За повече информация отидете на секция Документация.
Техническа експертиза
Пълна информация и документация към продуктите
24/7 онлайн поръчка
Избирате, сравнявате, поръчвате по всяко време
Сигурност на доставките
Информация за наличности и срок за доставка
- Converts almost 99.5% of electrical energy into heat. Fast response (full load within 30-40 minutes of cold start or within one minute of hot start)
- Operation at distribution voltages, eliminating the need for fuel lines, storage and processing equipment, economizers and emission control equipment, saving capital costs.
- CEJWS boilers are designed to use 3-phase, 4-wire distribution (or 3-phase 3-wire with special grounding) to the breaker. The boiler casing and cage must be earthed to the structural steel and earthing mat.
Application | Textiles, Industrial treatment plants, Hospitals, schools, hotels, Food processing plants, Plastic plants, Chemical plants |
---|